Vehicle

2021 Subaru® Ascent Limited 7-Passenger

Miles: 72,273VIN: 4S4WMAMD1M3423431Stock #: P14080

Retail Price:

$23,350

Our Price:

$23,350

Vehicle Specification

Body TypeSUV
ConditionUsed
Miles72,273
EngineIntercooled Turbo Regular Unleaded H-4 2.4 L/146
TransmissionVariable
DrivetrainAWD
Fuel TypeGasoline
City MPG20
Highway MPG26
Exterior ColorBrilliant Bronze Metallic
Interior ColorWarm Ivory

Features

  • Heated Seats
  • Power Seats
  • Leather Seats
  • Push to Start
  • Backup Camera
  • 3rd Row Seats
  • Heated Steering
  • Keyless Entry
  • Autonomy Features
  • Captains Chair
  • Blind Spot Monitor
  • Seat memory

Hours

  • Sunday:Closed
  • Monday:Closed
  • Tuesday:Closed
  • Wednesday:Closed
  • Thursday:Closed
  • Friday:Closed
  • Saturday:Closed

Address and contact information

4435 68th St. N, Suite A, Brooklyn Center, MN 55429

(651) 422-7489

Our Price

$23,350
1/34

Price

Prices shown may include additional dealer fees including, but not limited to, state taxes, registration fees, finance charges, emissions testing fees, dealer installed options doc fees, add-ons, or transportation fees. The price labeled "OUR PRICE" may include manufacturer rebates or incentives that are not listed on this website. Pricing of vehicles on this website does not include options that may have been installed at the Dealership. Some customers may not qualify for all rebates. Rebates are subject to residency restrictions. Any customer not meeting the residency restriction may receive a dealer discount in the same amount of the manufacturer rebates. Please contact the dealer to confirm. Price includes largest available incentive. Dealer reserves right to correct any pricing error prior to final sale. Please contact dealer for more information on applicable rebates or incentives for this vehicle.

Vehicle Information

While every effort has been made to ensure display of accurate data, including pricing data, the vehicle listings on this website may not reflect all accurate vehicle items. Accessories and color may vary. All Inventory listed is subject to prior sale. The vehicle photo displayed may be an example only. Vehicle Photos may not match exact vehicle?. Please confirm vehicle price with dealer. All materials on this site are presented to the user "as is" without warranty of any kind, either express or implied.

Vehicle Availability

Vehicles shown on this site may not currently be in dealer's inventory. Additionally, vehicles shown may be in the inventory of a partner dealership or a dealership with shared ownership. If this is the case, this vehicle is not in our inventory but can be made available to you at dealer's location within a reasonable time.

EPA Disclaimer

Any MPG listed is based on model year EPA mileage ratings. Use for comparison purposes only. Your actual mileage will vary, depending on how you drive and maintain your vehicle, driving conditions, battery pack age/condition (hybrid only) and other factors. For additional information about EPA ratings, visit http://www.fueleconomy.gov/feg/label/learn-more-PHEV-label.shtml.

2021 Subaru® Ascent

Limited 7-Passenger

72,273

miles

Our Price

$23,350

$426

per month

7.99

% APR

$2,335

Down

60

Months

Get pre-qualified in seconds.
I have read and agree to the Privacy Policy